Duplicating Projects
Copy an existing project's maps, signs, sign types, and reference documents to save setup time.
2 min readUpdated May 13, 2026organiser
If you run similar projects regularly, duplicating an existing project saves you from rebuilding maps, signs, and sign types from scratch. Signplanr copies the structure of the source project into a new draft, so you can adjust the details and go live quickly.
How to duplicate a project
- Open the project you want to copy.
- Click the ... menu in the top-right corner.
- Select Duplicate Project.
- Signplanr creates a new project pre-filled with the source project's data.
- Update the Project Name, dates, and any other fields you want to change.
- Click Create Project.
The new project starts in draft status, giving you a chance to review and adjust everything before activating it.
What gets copied
Duplication carries over the structural elements of your project:
- Maps: all image maps and geo maps, including sign placements.
- Signs: every sign record with its location, instructions, and custom field values.
- Pinned library sign types: the source project's library type pins are copied to the duplicate, so the same picker is available on day one.
- Project-only sign types: duplicated as fresh project-only types on the new project (not promoted to the library). Signs that referenced them are rewired to the new types, so editing one project's project-only types doesn't affect the other.
- Reference Documents: all project-level and sign-level reference documents, plus any sign↔project-level document links you set up. Each link is remapped so the duplicated signs reference the duplicated project-level documents (no cross-project linking).
- Customer link: if the source project was linked to a customer, the duplicate inherits that link. Edit it on the new project if needed. See Assigning customers to projects.
What does not get copied
Operational data tied to the original project is excluded:
- Contractors: no contractor assignments or invitations carry over.
- Photos: installation photos are not duplicated.
- Status History: all signs reset to their initial status in the new project.
- Comments: sign comments and announcements are not included.
After duplicating, review the sign list to remove any signs that don't apply to the new project before moving to active.